Skip to main content
Fig. 1 | Swiss Journal of Geosciences

Fig. 1

From: Gotthard-Durchstich

Fig. 1

Durchstich or Durchschlag: the breakdown of the final rock barrier in a tunnel project. The historical moment in the 57 km long Gotthard Base Tunnel, 15 October 2010, 2:17 pm—the face of the Tunnel Bore Machine appears, a large rock block falls, the audience is tense with excitement (photo adapted from Neue Zürcher Zeitung, 16 October 2010)

Back to article page