Fig. 17From: In-situ experiments on bentonite-based buffer and sealing materials at the Mont Terri rock laboratory (Switzerland)View into borehole SB2 (diameter 300 mm) after emplacement of sand/bentonite mixture (left), after installation of the packer (centre), and after grouting of the borehole cellar (right) (Rothfuchs et al. 2012)Back to article page