Fig. 8From: Implementation of the full-scale emplacement (FE) experiment at the Mont Terri rock laboratoryOverview showing the main instrumentation phases of the FE experiment. The graphs at the top also indicate the borehole arrangements around the 50 m long FE tunnel. The graphs at the bottom represent strongly simplified summaries of the many different instrumentation cross-sections within the 2.5–2.7 m diameter FE tunnelBack to article page